![](https://complexengineering.com/wp-content/uploads/2021/03/Steel2.jpg)
Manufacturing Warehouse
Our Client installed a new warehouse that contained a crane. We supervised the electrical requirements to power feed the unit, including cable tray, cable sizing, panel schedules, breaker sizing, drop voltage calculations, and upgrading of existing switchboards to incorporate new feeders.
- Client
- Optimus Steel
- Completed Date
- March, 2022